[1]
“Determining the Priority of Transport Station Construction Site Using AHP Methods”, J. Electr. Eng. Comput. Sci., vol. 1, no. 2, pp. 109–118, Dec. 2016, doi: 10.54732/jeecs.v1i2.172.