[1]
Raharjo, D.S. and Hartati, S. 2016. Determining the Priority of Transport Station Construction Site Using AHP Methods. JEECS (Journal of Electrical Engineering and Computer Sciences). 1, 2 (Dec. 2016), 109–118. DOI:https://doi.org/10.54732/jeecs.v1i2.172.