Raharjo, D. S. ., & Hartati, S. (2016). Determining the Priority of Transport Station Construction Site Using AHP Methods. JEECS (Journal of Electrical Engineering and Computer Sciences), 1(2), 109–118. https://doi.org/10.54732/jeecs.v1i2.172